An integrated approach to panel width, fleet size, and change-out time optimization in room-and-pillar mines

dc.contributor.authorAnani, A.
dc.contributor.authorNyaaba, W.
dc.contributor.authorCordova, E.
dc.date.accessioned2025-01-20T21:03:58Z
dc.date.available2025-01-20T21:03:58Z
dc.date.issued2022
dc.description.abstractOptimization of panels, haulage fleet, and waiting area involves deterministic and low-fidelity methods and experiential knowledge. The process is challenging because coal recovery and operational capabilities must be considered in the solution. The approach in this manuscript comprises the development of an integrated stochastic simulation model of a coal room-and-pillar system that addresses these challenges. The decision variables evaluated are panel width, number of shuttle cars, and change-out time (COT). The results show that the mine should implement the shortest possible COT, decreasing the cycle time and thereby increasing productivity and continuous miner (CM) utilization. The highest productivity and CM utilization for a fleet size of three shuttle cars is found in the 15-entry panel width. For the evaluated fleet sizes, the 19-entry panel width is optimal for the four and five shuttle cars. Among the three variables studied, panel width and fleet size had the most significant effects (5% increase) on the CM productivity, cycle time, and utilization.
dc.fuente.origenWOS
dc.identifier.doi10.17159/2411-9717/1509/2022
dc.identifier.eissn2411-9717
dc.identifier.issn2225-6253
dc.identifier.urihttps://doi.org/10.17159/2411-9717/1509/2022
dc.identifier.urihttps://repositorio.uc.cl/handle/11534/93197
dc.identifier.wosidWOS:000832433200003
dc.issue.numero4
dc.language.isoen
dc.pagina.final190
dc.pagina.inicio181
dc.revistaJournal of the southern african institute of mining and metallurgy
dc.rightsacceso restringido
dc.subjectDiscrete event simulation
dc.subjectpanel width
dc.subjectroom-and-pillar
dc.subjectfleet size
dc.subjectproductivity
dc.subjectchange-out time
dc.titleAn integrated approach to panel width, fleet size, and change-out time optimization in room-and-pillar mines