Achieving lean design process: Improvement methodology

dc.contributor.authorFreire, J
dc.contributor.authorAlarcon, LF
dc.date.accessioned2024-01-10T13:10:49Z
dc.date.available2024-01-10T13:10:49Z
dc.date.issued2002
dc.description.abstractAn improvement methodology is proposed for the design process in construction projects. Based on concepts and principles of lean production, the methodology considers the design process as a set of three different models-conversion, flow, and value. Four stages are necessary to produce improvements and changes-(1) diagnosis/evaluation; (2) changes implementation; (3) control; and (4) standardization. The methodology suggests the application of seven tools in accordance to specific needs (detected and desired) on five potential areas of improvement-client, administration, project, resources, and information. Results of an application included an increase of 31% in the share of value adding activities, 44% reduction of unit errors in the products, up to 58% decrease of waiting times in the process, and an expansion of the utilization in the cycle times. In this manner, not only did the efficiency and effectiveness of internal engineering products improve, but also the whole project, by improving one of the main suppliers of construction.
dc.fechaingreso.objetodigital2024-04-25
dc.format.extent9 páginas
dc.fuente.origenWOS
dc.identifier.doi10.1061/(ASCE)0733-9364(2002)128:3(248)
dc.identifier.issn0733-9364
dc.identifier.urihttps://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(248)
dc.identifier.urihttps://repositorio.uc.cl/handle/11534/77940
dc.identifier.wosidWOS:000175722300007
dc.information.autorucIngeniería;Alarcón L;S/I;100096
dc.issue.numero3
dc.language.isoen
dc.nota.accesocontenido parcial
dc.pagina.final256
dc.pagina.inicio248
dc.publisherASCE-AMER SOC CIVIL ENGINEERS
dc.revistaJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
dc.rightsacceso restringido
dc.subjectconstruction industry
dc.subjectdesign
dc.subjectproject management
dc.subject.ods09 Industry, Innovation and Infrastructure
dc.subject.odspa09 Industria, innovación e infraestructura
dc.titleAchieving lean design process: Improvement methodology
dc.typeartículo
dc.volumen128
sipa.codpersvinculados100096
sipa.indexWOS
sipa.indexScopus
sipa.trazabilidadCarga SIPA;09-01-2024
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
2024-04-25. Achieving lean design process - Improvement methodology.pdf
Size:
2.62 KB
Format:
Adobe Portable Document Format
Description: