Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects

dc.catalogadorjca
dc.contributor.authorRojas, Claudia
dc.contributor.authorMourgues Álvarez, Claudio Enrique
dc.contributor.authorRosa García, Pilar de la
dc.contributor.authorMesa Hernandez Harrison Adrian
dc.contributor.authorRuz Quiroga, Francisco
dc.contributor.authorGuindos Bretones, Pablo
dc.date.accessioned2025-10-14T14:41:43Z
dc.date.available2025-10-14T14:41:43Z
dc.date.issued2025
dc.description.abstractStandardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.
dc.fechaingreso.objetodigital2025-10-14
dc.format.extent18 páginas
dc.fuente.origenORCID
dc.identifier.doi10.3390/buildings15111835
dc.identifier.issn2075-5309
dc.identifier.scopusidSCOPUS_ID:105007661779
dc.identifier.urihttps://doi.org/10.3390/buildings15111835
dc.identifier.urihttps://repositorio.uc.cl/handle/11534/106145
dc.identifier.wosidWOS:001507505500001
dc.information.autorucEscuela de Ingeniería; Mourgues Álvarez, Claudio Enrique; 0000-0001-6706-2255; 2596
dc.information.autorucEscuela de Ingeniería; Guindos Bretones, Pablo; 0000-0001-7471-0281; 1051045
dc.information.autorucEscuela de Construcción Civil; Mesa Hernandez Harrison Adrian; S/I; 201335
dc.issue.numero11
dc.language.isoen
dc.nota.accesocontenido completo
dc.pagina.final18
dc.pagina.inicio1
dc.revistaBuildings
dc.rightsacceso abierto
dc.rights.licenseCreative Commons Attribution (CC BY)
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.subjectTimber
dc.subjectIndustrialization
dc.subjectPrefabrication
dc.subjectExchange model
dc.subjectCost estimation
dc.subjectBIM
dc.subject.ddc620
dc.subject.deweyIngenieríaes_ES
dc.titleImpact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects
dc.typeartículo
dc.volumen15
sipa.codpersvinculados2596
sipa.codpersvinculados1051045
sipa.codpersvinculados201335
sipa.trazabilidadORCID;2025-06-03
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
buildings-15-01835.pdf
Size:
3.17 MB
Format:
Adobe Portable Document Format
Description: